Hubbard Construction Wins Atlantic / Kernan Overpass Project

May 13th, 2008

Owner: Jacksonville Transportation Authority

Bid Amount: $22 million

Project Description: 1.6 mile- long roadway realignment and tight urban diamond interchange project that will create a grade-separated intersection. The project will require the construction of two bridges to span Kernan Blvd. and MSE walls to contain the approaches. Signalization, roadway, maintenance of traffic, lighting, roadway drainage, signing and marking, utility relocations, supporting electrical supply, overhead sign structures, sidewalks, barrier wall, clearing, grubbing, and mass grading is also included.

Duration of job: 22.5 months

Estimator: Rob Lightfoot

Crew members:
Project Manager- Michael J Zanella
Field Engineer- Fred Sumter
Superintendent- Jamie Lewis

Hubbard Group | Hubbard Construction Co. | Blythe Construction | Eurovia |©2007 Hubbard Group